Media Statement: NightBus Overnight Bus Service Pilot
TransitMatters is grateful for today’s action by the FMCB to advance the NightBus overnight bus service pilot.
BOSTON, June 4, 2018 — TransitMatters is grateful for today’s action by the FMCB to advance the NightBus overnight bus service pilot. We began our advocacy for NightBus in early 2016, developing what we believed was a cost-effective response to the MBTA’s decision to end the prior late night service. Over time we were joined by dedicated municipal co-sponsors from Boston, Cambridge, Somerville, Revere and Chelsea. Our collaboration with an equally committed MBTA staff has led to this milestone achievement. Overnight bus transit in Greater Boston, open to all but designed primarily around the transit needs of the late night and early morning workers, needed to keep our city running; in short: NightBus will respond to the economic realities of a city and region that functions on a 24/7 basis.
It has been a long road since we first brought our NightBus concept to the T in March 2016 and now we are close to seeing the tangible results of that effort. Our thanks are extended to the FMCB, MBTA staff, the City of Boston & our other municipal co-sponsors, and all who supported us. We look forward to continued collaboration to provide the transit service people need, want and deserve in a city and region that never stops working.
Media Statement: Overnight Service
Today, the MBTA Fiscal Management and Control Board encouraged MBTA staff to move forward in working out details for NightBus, a proposal for overnight bus service put forward by TransitMatters earlier this year.
BOSTON, September 26, 2016 — Today, the MBTA Fiscal Management and Control Board encouraged MBTA staff to move forward in working out details for NightBus, a proposal for overnight bus service put forward by TransitMatters earlier this year.
A number of local and state representatives, allies, and citizens lined up this afternoon to submit public comment. We thank them for their support and appreciate their ongoing advocacy as we move forward in our work with the T.
Boston doesn't stop working after midnight; neither should its transit system. Our plan responds to the realities faced by people every day. Numerous people work late nights and early mornings in businesses and industries that make Boston attractive as a place to live, play, work and invest in: at Logan airport; at our great hospitals; at restaurants and hotels; in the innovation sector that competes globally and works around the clock. We are not responding to these needs and are not providing the mobility that other great cities provide their citizens.
One way to test whether our public transportation system is responding effectively to the needs of our citizens is to ask whether it leaves anyone without affordable and reliable service. Until we establish cost effective overnight service we won't be able to answer that question the way we all should want to.
We share the Board’s concerns about forward progress on the proposal that we have worked with MBTA staff to develop. We also agree that we should have better data to shape the face of this service and that we need to establish success factors for any overnight service.
Today’s outpouring of support shows there is latent demand and we appreciate that the MBTA will continue to collaborate with us to fill this current void in Greater Boston’s transit service. We are committed to working through this process to see year a NightBus service that responds to clear needs implemented by the end of this year.
Late Night Mitigation: Designing a Real Overnight Bus Network
Wondering what to make of the T's late night mitigation proposals? We at TransitMatters often talk about critical issues such as service hours, frequency, on-time performance and overcrowding. So we’re pleased to see the MBTA recognizes these problems.
Check out the latest on NightBus here
Wondering what to make of the T's late night mitigation proposals?
We at TransitMatters often talk about critical issues such as service hours, frequency, on-time performance and overcrowding. So we’re pleased to see the MBTA recognizes these problems. The specific proposals they have put forth are all good ideas and easy to implement, but they are only small tweaks (which should have been done long ago) and do not make a dent in the growing backlog of service deficiencies (the service that's needed but not currently provided).
We believe there is a better option: a limited overnight bus network as we originally discussed here, which would be an extension of the T’s existing, limited and little-known early morning bus service. This network would operate hourly all night, every night, and be geared primarily toward getting people to their late-night and early morning jobs.
Read all about our useful and affordable plan on the Amateur Planner and CommonWealth Magazine.
Want to know more about what the T has proposed?
Let’s look at the service deficiencies that have been identified:
Service ends too early and starts too late. The proposed changes would not change the hours of service. They would push service a tiny bit earlier in a few cases to increase capacity, but you still can’t get to a 5am shift (or home from a 2am shift) in most of the city.
Bus frequency and on-time performance (reliability) are woefully inadequate. Adding trips (frequency) can relieve overcrowding *if buses are on time*, but does not improve reliability. A comprehensive "bus service improvement plan" is needed to address the persistent underlying causes of poor service, such as traffic congestion, bus bunching, missed trips, outdated fare collection policies and the lack of on-street supervisors and dispatchers.
Still relying on the published schedule? On a typical weekday, Route 111 (serving the overwhelmingly low-income and minority city of Chelsea), sees 1 out of every 15 trips cancelled due to insufficient staffing levels. If 13 scheduled trips are missed every day on one of the city's most crowded bus routes, how will adding more trips to the schedule solve this problem?
Low-income workers can’t access early or late shifts. Even while the recent Late Night Service only ran two nights per week and did not reach everyone, it filled a critical need of low-income workers in the restaurant and entertainment industries. The lack of daily service was a major deficiency, but the latest proposals don’t even attempt to solve that problem. Our proposal would end this injustice.
The recently eliminated Late Night Service served 13,000 passengers per night or 26,000 per week (which greatly undercounts the beneficiaries because most people don’t use it every single day and almost every user also travels on regular daytime service). Even with all of the mitigation options combined, and if they operate as planned, only 5,000 passengers per week would see improvements.
All the options they're proposing still don't make a dent in on-time performance, capacity or the growing backlog of service deficiencies. It is clear that the need for early morning service far outweighs the level of service provided, and that service starts way too late. It would actually be simple and affordable to provide hourly bus service all night on a skeletal network with timed transfer points, and the T should pursue this option instead of working around the margins.
Read more on why all night service is needed, and listen to Podcast 26 where we discuss the overnight concept (as well as in earlier episodes). Head over to the Amateur Planner for all the details on our proposal.
Categories
- Children (1)
- Diversions (1)
- Olympics (1)
- MAPC (2)
- Red–Blue Connector (2)
- Urban Design (3)
- Bus (4)
- Fares (4)
- Late Night Service (4)
- MBTA ROC (4)
- Silver Line (4)
- Snow (5)
- Blue Line (8)
- Emergency (8)
- Orange Line (8)
- Public Comment (8)
- Maintenance (9)
- Operations (9)
- Signage (9)
- Fare Collection (10)
- Labs (11)
- Safety (11)
- Planning (12)
- Communication (14)
- MBCR (14)
- MassDOT (14)
- Green Line (16)
- History & Culture (16)
- Red Line (18)
- MBTA Bus (21)
- Commuter Rail (24)
- Advocacy (26)
- Capital Construction (28)
- Politics (30)
- Podcast (35)
- News (38)
- Media (40)
- Funding (42)
- Statements (50)
- MBTA (57)